This Cheltenham kitchen was challenging. It was winter during installation and we were using a new UK fabricator. There were complex details to incorporate, for example, six plumbed-in plinth heaters into the island, a shelf in the pocket doors that needed to be resin fixed to the wall before the rest of the kitchen, warped panels due to the cold and a non-London location. I had prepared the order drawings and the M&E's so it was on me if things went astray. I got us there with the support of amazing people.